Drill Pipe Conection

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Hebei

  • Validity to:

    Long-term effective

  • Last update:

    2022-07-27 11:10

  • Browse the number:

    58

Send an inquiries

Company Profile

Hebei Shengtian Group Seamless Steel Pipe Co., Ltd

By certification [File Integrity]

Contact:stwfgg123(Mr.)  

Email:

Telephone:

Phone:

Area:Hebei

Address:Hebei

Website:http://www.shengtiansteelpipes.com/ http://stwfgg123.reagent17.com/

Product details

Drill Pipe

In oilfield drilling engineering, the drill pipe conection is the main component of the ground rotation system, the lifting system, the circulation system, the drill collar and the drill bit. It reaches the turntable to drive the drill bit to rotate, the hook drives the drill bit to lift, and the mud is sent to the bottom of the well to form a circulation so that the drill bit can break the rock formation and drill continuously. There are four kinds of coating drill pipe optional including TK34, DPC, TC2000, TC3000.


The usual components of drill pipe connection are: drill bit, drill collar, drill pipe, stabilizer, special joint and kelly. The basic functions of the drill string mainly include tripping the drill bit; applying weight on bit; transmitting power; transporting drilling fluid; carrying out special operations: squeezing cement, dealing with downhole accidents, etc. The connection has the characteristics of convenient and rapid disassembly and assembly, good sealing, high tensile strength and high pile quality.


Standards and technical conditions for supply: API SPEC 5DP The wear-resistant belt of tool joint: Arco 100XT, 200XT, 300XT, 400XT Internal

Coating drill pipe: TK34, DPC, TC2000, TC3000


Standard: Drill pipe

Grade: E75, X95, G105, S135

The wear-resistant belt of tool joint: AIMCO 100XT, 200XT, 300XT, 400XT

Internal coating drill pipe: TK34, DPC, TC2000, TC3000

Usage: Mine blasting, water well drilling, geothermal wells drilling, fore poling, coal and nonferrous metal mining projects, etc.


Dimension:

size designation

Calculated

weight

Tool joint

designation

Calculated weight

grade

wall thickness

Upset ends

in

1b/ft

Kg/m

in

mm

2 3/8

6.65

NC26

6.26

9.32

E.xG.S

0.28

7.11

EU

2 7/8

10.4

NC31

9.72

14.48

E.xG.S

0.362

9.19

EU

3 1/2

13.3

NC38

12.31

18.34

E.XG.S

0.368

9.35

EU

3 1/2

15.5

NC38,NC40

14.63

21.79

E.xG.S

0.449

11.4

EU

4

14

NC40,NC46

12.93

19.26

E.XG.S

0.33

8.38

IU,EU

4 1/2

16.6

NC46,NC50

14.98

22.31

E.XG.S

0.337

8.56

EU,IEU

4 1/2

20

NC46,NC50

18.69

27.84

E.xG.S

0.43

10.92

EU,IEU

5

19.5

NC50,NC52

17.93

26.71

E.xG.S

0.362

9.19

IEU

5

25.6

NC50,5 1/2FH

24.03

35.79

E.XG.S

0.5

12.7

IEU

5 1/2

21.9

5 1/2FH

19.81

29.51

E.XG.S

0.361

9.17

IEU

5 1/2

24.7

51/2FH

22.54

33.57

E.XG.S

0.415

10.54

IEU

6 5/8

25.2

6 5/8FH

22.19

33

E.xG.S

0.33

8.387

IEU

6 5/8

27.7

6 5/8FH

24.21

41

E.XG.S

0.362

9.19

IEU


HOT TAGS: DRILL PIPE, DRILLING, OIL WELL DRILLING, DRILL COLLAR. API 5DP PDF, DRILL PIPE SPECIFICATIONS

http://www.shengtiansteelpipes.com/